ANALISIS WAKTU DAN BIAYA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK RUMAH TINGGAL 2 LANTAI

Time And Cost Analysis Using The Method Time Cost Trade Off In 2 Story Residential House Projects

Authors

  • I Putu Yogistha Nakti Program Studi Teknik Sipil Unmas Denpasar
  • Bagus Widhi Dharma S. Universitas Qamarul Huda Badaruddin, Bagu
  • Baiq Reni Sari Dewi Universitas Mahasaraswati Denpasar

DOI:

https://doi.org/10.59896/aqlu.v2i2.96

Keywords:

Analysis, Time Cost Trade Off, Overtime Working Hours, Increasing Number of Workers

Abstract

The purpose of this study was to analyze time and costs with an initial Time Schedule using the Time Cost Trade Off method in a 2-storey Residential House Development Project. The method used to complete this research is descriptive method by examining case studies. The results showed that the addition of overtime hours had an optimum duration of 146 HK or 3% which resulted in an increase in project costs due to overtime hours of Rp. 2,628,281.25 so that the project cost increases from Rp. 767,230,000.00 to Rp. 769,858,281.25 Meanwhile, the addition of the number of workers with an optimum time of 146 HK resulted in an increase in project costs of IDR 95,000.00 so that the project cost increased from IDR. 767,230,000.00 to Rp. 76.325,000.00 . From the results of this study it can be seen that adding workers is more efficient than adding overtime hours with greater cost advantages.

References

Soeharto, (1999). Manajemen Proyek Konstruksi : Edisi Kedua. Jakarta : Erlangga

Sulistyo dan Fikri, (2021). Analisis Optimalisasi Waktu dan Biaya Proyek Konstruksi Menggunakan Metode Time Lost Trade Off (Studi Kasus : Proyek pembangunan Jalan Gorda-Bandung) Jurnal Intent, 4 (1). PP.25.40

Nugraha dkk, (1985). Manajemen Proyek Konstruksi 1. Jakarta: Kartika Yudha

Soeharto (1997). Imam Soeharto, 1997, Manajemen Proyek, edisi kedua, Penerbit Erlangga,Jakarta.

Priyo dan Aulia (2015). . Aplikasi Metode Time Cost Trade Off Pada Proyek Konstruksi: Studi Kasus Proyek Pembangunan Gedung Indonesia. Jurnal Ilmiah Semesta Teknika Vol. 18 No. 1, hal 30-34.

Downloads

Published

06-07-2024

How to Cite

Nakti, I. P. Y., Dharma S., B. W., & Dewi, B. R. S. (2024). ANALISIS WAKTU DAN BIAYA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK RUMAH TINGGAL 2 LANTAI: Time And Cost Analysis Using The Method Time Cost Trade Off In 2 Story Residential House Projects. Al-Aqlu: Jurnal Matematika, Teknik Dan Sains, 2(2), 109–115. https://doi.org/10.59896/aqlu.v2i2.96

Issue

Section

Articles