(1)
Nakti, I. P. Y.; Dharma S., B. W.; Dewi, B. R. S. ANALISIS WAKTU DAN BIAYA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK RUMAH TINGGAL 2 LANTAI: Time And Cost Analysis Using The Method Time Cost Trade Off In 2 Story Residential House Projects. Al-Aqlu: Jurnal Matematika, Teknik dan Sains 2024, 2, 109-115.