Nakti, I. P. Y., Dharma S., B. W. and Dewi, B. R. S. (2024) “ANALISIS WAKTU DAN BIAYA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK RUMAH TINGGAL 2 LANTAI: Time And Cost Analysis Using The Method Time Cost Trade Off In 2 Story Residential House Projects”, Al-Aqlu: Jurnal Matematika, Teknik dan Sains, 2(2), pp. 109–115. doi: 10.59896/aqlu.v2i2.96.