Nakti, I. P. Y., B. W. Dharma S., and B. R. S. Dewi. “ANALISIS WAKTU DAN BIAYA MENGGUNAKAN METODE TIME COST TRADE OFF PADA PROYEK RUMAH TINGGAL 2 LANTAI: Time And Cost Analysis Using The Method Time Cost Trade Off In 2 Story Residential House Projects”. Al-Aqlu: Jurnal Matematika, Teknik Dan Sains, vol. 2, no. 2, July 2024, pp. 109-15, doi:10.59896/aqlu.v2i2.96.