ANALISIS ELEVASI MUKA AIR BANJIR PERUMAHAN ALTURA DESA MAMBALAN METODE SHERMAN
Flood Water Level Elevation Analysis Altura Housing, Mambalan Village Sherman Method
DOI:
https://doi.org/10.59896/gara.v19i4.448Keywords:
Benchmark, Terraced Land, Rainfall Intensity, Flood Level, Drying Duration, Yudith ConcreteAbstract
Altura Housing is located on Jalan Raya Mambalan, Gunug Sari District, West Lombok Regency, with coordinates -8°55'02.36‘S and 116°130'29’E. Benchmark point + 38. The housing area is a potential rice field area. The topography of the housing area is terraced with sandy loam and clay soil types. The analysis aims to determine the flood height in the housing drainage channels according to the flow direction and the Altura Housing Site Plant. The Altura Housing Complex does not yet have a safe point against flooding, whether caused by very high rainfall intensity or flooding originating from the Rainfall Catchment Area (ADT). Therefore, an analysis of the Housing Complex flood level with a 2-year return period using the Sherman Method is required. The results of the analysis of the two-year return period flood discharge using the Sherman method obtained a Q2Th of 0.878 m3/sec with a maximum rainfall intensity of 175.521 mm/hour and a drying duration of 10 minutes. And the channel construction material was designed using Yudith K225 concrete. The analysis results obtained a primary Yudith base width (B) of 1 metre, a secondary B of 0.8 metres and a tertiary B of 0.5 metres, an average slope of 0.002, a water velocity of 0.777 m/sec, and a water level in the primary channel of 0.4 m. The flood level or flood water elevation (EMAB) of the primary channel is +35.80, the secondary channel is +36.10, and the tertiary channel is +36.60. Therefore, it can be recommended that the Altura Housing Complex is safe from flooding
References
Anonim. (1968). Kriteria Perencanaan Jaringan Irigasi (KP-03)
Asdak Chay.(2001) Hidrologi dan Pengendalian Daerah Aliran Sungai). Gajah Mada University Press.
Harto, B.S.(1993). Analisis Hidrologi. Gramedia Pustaka Utama.
Harto, B.S. (2000). Analisis Hidrologi. Gramedia Pustaka Utama.
Peraturan Menteri Pekerjaan Umum Republik Indonesia. (2014). Tata Cara Perencanaan Sistem Drainase Perkotaan. Lampiran 1 Permen PU No. 12/PRT/M/2014. Kementerian Pekerjaan Umum.
Salehudin. (2024). Analisis Kapasitas Sungai Makak Menggunakan Standart Step Method.. Jurnal Ganec Swara, 19(2) 656-668
Suripin. (2004). Sistem Drainase Perkotaan yang Berkelanjutan. Andi Offset.
Soemarto, C.D. (1987).Hidrologi Teknik.Usaha Nasional,Surabaya Indonesia.
Triatmodjo, B. (2010). Hidrologi Terapan , edisi ke dua . Beta Offset.
Wesli. (2008). Drainase Perkotaan. Graha Ilmu
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Salehudin Salehudin, Hasyim Hasyim, Rohani Rohani, Faeruzza Athiya

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.