[1]
I. P. Y. Hermawan, I. G. A. Diputera, I. G. A. A. I. Lestari, and I. G. W. Putra, “ANALISIS METODE PELAKSANAAN PEKERJAAN PENGECORAN DENGAN READY MIX (STUDI KASUS: PEMBANGUNAN MALL PELAYANAN PUBLIK TABANAN): Analysis Of Casting Work Implementation Methods Using Ready Mix (Case Study: Construction Of The Tabanan Public Service Mall)”, Ganec Swara, vol. 19, no. 4, pp. 1522–1527, Dec. 2025.